ITB Geothermal Workshop
Toward National Geothermal Capacity Building for Supporting Geothermal in Indoensia.
Institut Teknologi Bandung, 05 – 08 March, 2012
PROGRAMS;
– Pre-Workshop
Monday, 05 March 2012, Pre-Workshop Course Geothermal for Everyone, at Seminar Room Petroleum Engineering Building.
– Workshop, 06 – 07 March 2012
A. Panel Discussion, at East Hall
1. Capacity Building in Human Resources, Moderator: Benyamin Sapiie
2. Encouraging Geothermal Development in Indonesia, Moderator: Ali Ashat
3. Capacity Building in Research and Technology Development, Moderator: Hendra Grandis
B. Technical Sessions
– Plenary Session
– Exploration Topics
– Engineering Topics
– Multi-discipline Topics
– Chevron Safety Thermal Training
“Geothermal Harmony with Its Environment”, Submission Deadline: 3 March 2012 at 12.00 am / Free.
– Exhibition and Photo Contest
7 March, 2012, Safety for Entering Surface Thermal Manifestations
– Geothermal Field Trip
8 March, 2012, Kamojang Power Plant
The Kamojang geothermal field is one of the world’s few developed dry steam reservoirs. The continuous commercial operation from 1982 to 2009 is characterized by a slight decline in the wellhead. The natural state of the Kamojang geothermal field is characteristic oftypical vapor-dominated systems. The Kamojang reservoir has water saturation in the order of 25-35%. It mostly produces 100% steam.
SUBMISSION ADDRESS & DATE
Secretariat of 1st ITB Geothermal Workshop 2012 ITB
Geothermal Laboratory Program Studi Magister Teknik Panas Bumi, FTTM – ITB,
Gedung Teknik Perminyakan Lt.2,
Jl. Ganesa No.10, Bandung, Jawa Barat 40132
(+62)815-3616-6789 (Rios)
geothermalws2012@fttm.itb.ac.id
www.geothermal.itb.ac.id/workshop2012
Follow us on @ITBGeothermal